Studebaker Building Facade Repairs and Roof Replacement Update - March 2022

What is Happening

  • During the week of March 7, pipe scaffolding will be installed around the south and west elevation and mobilize on the roof level to probe metal panels on the south and west parapet.
  • The architect will perform a close-up inspection and sounding of terra cotta at parapet.
  • In late March, a sidewalk bridge, stair tower, and suspended scaffolding will be installed on the east elevation.
  • Demolition of the parapet at the east elevation will begin in early April.

What to Expect

  • Regular work hours will be 7 a.m. to 5 p.m., Monday through Friday
  • Some noise and other impacts typically associated with construction projects