An extensive restoration to College Walk repaired damaged sustained from over a decade of water penetration and uneven foundation layering. Repairs included the installation of a new storm drainage system to better manage storm run-off, asphalt pavers from Broadway to Amsterdam, granite curbs, and light fixtures.
This project was completed in 2007.