Below Grade

A sub-ground level loading dock

The Phase 2 Below-Grade project consisted of approximately 225,000 square feet of space supporting the Columbia Business School, central loading dock facility, and shell space for future campus support. This below-grade expansion connected the Jerome L. Greene Science Center and Lenfest Center for the Arts to allow for a shared loading dock and materials distribution and enables connections to future buildings.

About the Project

Completion date: December 2021

Square footage: 225,000